Rough-In Wiring
Before walls close, we run all branch circuit wiring, low voltage conduit, and panel connections. This is the phase that must happen before drywall. Missing this window means fishing wire through finished walls — slower and more expensive. We coordinate with your GC and show up on the rough-in schedule.
Panel Assessment and New Service
Some Arlington TX commercial spaces have adequate panel capacity for the incoming tenant. Others — especially spaces being converted from one use type to another — need a panel upgrade or a new circuit panel before the finish-out can be wired. We assess panel capacity at the site visit and include it in the scope before quoting.
Devices, Lighting, and Final Connections
After walls are finished, we install outlets, switches, lighting fixtures, and all final connections. For medical offices, we install isolated ground circuits and equipment connections. For restaurants, we install hood ventilation circuits and commercial cooking equipment connections. For offices, we install data pathway conduit and dedicated circuits for servers and AV equipment.
City of Arlington Permit and Inspection
Commercial tenant finish-out electrical requires a City of Arlington permit. Plan review is required for larger projects — allow three to seven business days for permit approval. We apply for the permit early in the project timeline so it does not hold up your move-in date.